Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Progress and status of the J-PARC 3 GeV RCS

Kinsho, Michikazu

Proceedings of 5th International Particle Accelerator Conference (IPAC '14) (Internet), p.3382 - 3384, 2014/07

Big issue for the J-PARC rapid cycling synchrotron (RCS) was displacement of main magnets caused by last big earthquake because this made beam loss more than 400 kW beam power. Since realignment of main magnets and other components was essential to realize higher beam power and stable operation, this work has been done during maintenance period in 2013. To achieve the nominal performance 1MW beam power at the RCS and 0.75 MW at the MR, beam energy of linac was increased from 181 MeV to 400 MeV with a new accelerating structure ACS (Annular-ring Coupled Structure) linac from this January. It was successful 400 MeV beam injection and 3 GeV beam extraction at the RCS, and user operation has been performed with beam power of 300 kW. An equivalent beam power of 560 kW with a beam loss of only 0.3% could be achieved during short time for high intensity beam study.

Journal Articles

Design of beam optics in the proton beam transport line from synchrotron to spallation neutron target

Meigo, Shinichiro; Noda, Fumiaki*; Fujimori, Hiroshi*; Ikeda, Yujiro

Proceedings of ICANS-XVI, Volume 3, p.967 - 976, 2003/07

In J-PARC project, spallation target is irradiated by 3 GeV proton beam of 1 MW. Due to hands on maintenance for the proton beam lines, loss of proton beam is limited less than 1 W/m. Since it is difficult to predict the phase space distribution of the proton beam, we decided that the beam line have to be larger acceptance for 324 $$pi$$ mrad, which is determined by the collimator located in the synchrotron. Distortion of proton beam is caused by the by the instability of angle at the extraction of 3-GeV synchrotron, miss alignment of the magnet, and un-uniformity of the magnet field. In this study, the distortion is calculated. In order to fit the conditions, the stability of extraction angles should be kept smaller than 0.2 mrad. As for the magnetic field, it is found that the uniformity should be kept better 5x10$$^{-4}$$ and 2x10$$^{-3}$$ for bending and quadruple magnets, respectively. It is also found the error of alignments should be limited smaller than 1.0 mm and 1.0 mrad.

2 (Records 1-2 displayed on this page)
  • 1